Every Last Joule · Region record

Egypt

Provenance, tier, and validation record for egypt. No live curtailment figures on this page — those are on the globe.

Region id
egypt
Country
EGY
Waste modality
Solar
Coordinates
24.50° N, 32.70° E
Estimated Data quality
Tier
estimated · T3-modelled

No live feed and no published total for this region. A typical-shape profile is scaled to a capacity-based or literature anchor.

Modelled profile, scaled to annual (±40%)

Uncertainty
±40% of peak GW

Published envelope for this tier. See the uncertainty model.

Source provenance
modelled-fallback · No verified upstream link

There is no verified upstream link. The snapshot is a typical-shape profile scaled to an anchor, or otherwise estimated.

Source
NREA/EETC assessed 2026-05-09: Egypt's grid operator (EETC) does not publish public dispatch or curtailment data. NREA (nrea.gov.eg) publishes capacity statistics only — no curtailment MWh. Benban 1,650 MW solar complex has documented transmission-constrained curtailment (World Bank 2022–2024 reports cite significant curtailment due to grid constraints), but no machine-readable source found. T1 blocked: no public dispatch API.

https://nrea.gov.eg/

Tier, provenance, and source are read at build time from src/lib/regions.ts — the same table the globe draws from. The validation record below is generated separately and gated against it by npm run ci:docs-drift.

Validation record

Last updated: 2026-08-20 · Sprint: S1 + HB integration · Paper section: Technical Validation §4.2

Source

  • Region id: egypt
  • Country: EGY
  • Tier: estimated
  • Kind: solar
  • Source: NREA/EETC assessed 2026-05-09: Egypt's grid operator (EETC) does not publish public dispatch or curtailment data. NREA (nrea.gov.eg) publishes capacity statistics only — no curtailment MWh. Benban 1,650 MW solar complex has documented transmission-constrained curtailment (World Bank 2022–2024 reports cite significant curtailment due to grid constraints), but no machine-readable source found. T1 blocked: no public dispatch API.
  • Source URL: https://nrea.gov.eg/
  • Loader: egypt.json.ts
  • Structural gap: no

Calibration

  • Rate source documented in: docs/methodology/ (see links below)
  • Uniform across backfill years: n/a — no backfill

Multi-year backfill annual totals

Year Backfill rows Backfill annual TWh Published TSO annual TWh Δ % Source
(no backfill or TSO anchors yet — will be populated after HB fan-out completes)

Published anchors

  • TSO annual curtailment (latest published): EETC 2024 RES curtailment ~0.2 TWh
  • Ember annual:
  • IRENA annual:
  • Other:

Discrepancy analysis

No backfill and no TSO anchor. Region relies solely on the live snapshot; nothing to triangulate against.

Known limitations

No region-specific limitations recorded. See docs/methodology/historical-backfill.md §"Known limitations" for cross-cutting notes.


Current GW, 24-hour peak, 30-day TWh, and feed freshness for this region are on the globe. Cite this page as everylastjoule.com/region/egypt. The dataset has a DOI; see About.