Every Last Joule · Region record

Bangladesh

Provenance, tier, and validation record for bangladesh. No live curtailment figures on this page — those are on the globe.

Region id
bangladesh
Country
BGD
Waste modality
Solar
Coordinates
24.00° N, 90.00° E
Estimated Data quality
Tier
estimated · T3-modelled

No live feed and no published total for this region. A typical-shape profile is scaled to a capacity-based or literature anchor.

Modelled profile, scaled to annual (±40%)

Uncertainty
±40% of peak GW

Published envelope for this tier. See the uncertainty model.

Source provenance
official-lead · Official source identified, live path not producing

An authoritative source exists and the loader is wired or scaffolded, but the live path is not producing usable data — geoblocked, auth-gated, or parser pending. The emitted snapshot falls back to modelled or last-good values.

Source
PGCB hourly solar generation (erp.powergrid.gov.bd). Waste unpublished — no national curtailment series. BPDB daily PDF is not the TSO path.

https://erp.powergrid.gov.bd/web/generations/view_generations_bn

Tier, provenance, and source are read at build time from src/lib/regions.ts — the same table the globe draws from. The validation record below is generated separately and gated against it by npm run ci:docs-drift.

Validation record

Last updated: 2026-08-20 · Sprint: S1 + HB integration · Paper section: Technical Validation §4.2

Source

  • Region id: bangladesh
  • Country: BGD
  • Tier: estimated
  • Kind: solar
  • Source: PGCB hourly solar generation (erp.powergrid.gov.bd). Waste unpublished — no national curtailment series. The previous 0.1 TWh/yr repo estimate was dropped.
  • Source URL: https://erp.powergrid.gov.bd/web/generations/view_generations_bn
  • Loader: bangladesh.json.ts
  • Structural gap: no
  • Waste status: unpublished. Missing ≠ zero. Live generation does not make waste T1a.

Calibration

  • Rate source documented in: docs/methodology/ (see links below)
  • Uniform across backfill years: n/a — no backfill

Multi-year backfill annual totals

Year Backfill rows Backfill annual TWh Published TSO annual TWh Δ % Source
(no backfill or TSO anchors yet — will be populated after HB fan-out completes)

Published anchors

  • TSO annual curtailment (latest published): none. PGCB publishes hourly generation by fuel, not curtailment, and no Bangladeshi operator publishes a national curtailment total or rate. BPDB 2024 RES curtailment is described as minimal (coal-dominant grid) but is not quantified.
  • Ember annual: —
  • IRENA annual: —
  • Other: —

Discrepancy analysis

No backfill and no TSO anchor. Region relies solely on the live snapshot; nothing to triangulate against.

Known limitations

  • Waste is unpublished. PGCB publishes hourly solar generation, not curtailment, and Bangladesh has no published national curtailment rate. The 0.1 TWh/yr figure this region used to carry was the repo's own estimate and has been dropped. Do not read a zero waste profile as a measured finding.
  • The window is short. PGCB exposes roughly 48 hours of hourly rows. The 30-day generation total is annualised from the diurnal mean, not summed over two days.
  • TLS chain is broken upstream. erp.powergrid.gov.bd serves only its leaf certificate. The loader relaxes chain verification and checks CN/issuer explicitly.

See docs/methodology/historical-backfill.md §"Known limitations" for cross-cutting notes.


Current GW, 24-hour peak, 30-day TWh, and feed freshness for this region are on the globe. Cite this page as everylastjoule.com/region/bangladesh. The dataset has a DOI; see About.